ARCHITECTONIC PROPOSAL
At the moment, the request for previous information regarding the construction works,
to build a new hotel has already been submitted to C.M.O. (City Hall of Oeiras),
-
The proposal for the new buildings includes::
• New buildings in the hill slopes
• A building Northeast of the Palace, which will be a SPA
• Parking areas
• Connections among the different buildings through transparent corridors and lifts.
General aspects of new projects (does not include the existing construction area):
• Maximum clearance (new buildings): 6.5 m
• Gross construction area (new buildings): 1 886.01 m²
• Maximum number of floors (new buildings): 2
• Volumetry (new buildings): 3 772.02 m³
• Garage (underground basement): 1 433.70 m²
Existing construction area /since the property origin -
• Palace and other buildings: 1 871 m²